Educational

Adam's Spanish Immersion School

Adam's Spanish Immersion School Adam's Spanish Immersion School Adam's Spanish Immersion School Adam's Spanish Immersion School Adam's Spanish Immersion School Adam's Spanish Immersion School Adam's Spanish Immersion School Adam's Spanish Immersion School

Location: St. Paul, MN Type: Plan & Spec, Remodel & Addition Size: 95,575 square feet

This phased project went through two summers and two school years. Phase 1 was a 2-story addition to the west and a 4-story addition to the north. Phases 2-4 were a complete remodel of the remaining school. Everything from the main service throughout the building was replaced with new electrical equipment/fixtures. The #1 priority with this project was that the students and staff were able to operate on their normal schedule in a safe and secure building separate from the construction zones.

Unity School, WI

Unity School, WI Unity School, WI Unity School, WI Unity School, WI Unity School, WI Unity School, WI Unity School, WI

Location: Balsam Lake, WI Type: Design Build Size: 120,000 square feet

New addition and remodeling of Auditorium, Gymnasium, Weight Room, Cafeteria, Classrooms and hallways – electrical and installation of new lighting, fire alarm system, audio/visual and security.

Saint Agnes School

St. Agnes School St. Agnes School St. Anges School

Location: St. Paul, MN Type: Design/Build, New Addition Size: 37,059 square feet

This project started with the demolition of Bandas Hall which included the relocation of the existing utility service and the creation of a new electrical service. The existing electrical service was updated and refed from the new service. We worked with the Owner as a Design/Build Electrical Contractor to complete their new building called the Ubel Athletic Center (UAC). The UAC includes Bandas Gym and locker rooms, new Main Office, Music & Vocal Classrooms, additional Classrooms, a grand Commons Area and a shell space for a future Auditorium.

St. Croix Falls Elementary School

St. Croix Falls Elementary School St. Croix Falls Elementary School St. Croix Falls Elementary School

Location: St. Croix Falls, WI Type: Addition and Remodel Size: 106,000 square feet

NEI was the successful electrical contractor for a 40,000 square foot addition and 30,000 square foot extensive remodel. This included a gymatorium, 25+ classrooms for K-4 students, Media Center, and a new kitchen. Electrical services performed include Interior and Exterior Site lighting with total facility lighting control, new 1600 amp 277/480 volt service, Fire Alarm, and complete rough-in for all low voltage systems.